Applied Digital, a Dallas company that builds data centers for artificial intelligence (AI), has signed about $36.2bn of leases running roughly 15 years, its annual report says. Two buildings are running in Ellendale, North Dakota, and four more campuses are under construction. Little of that rent will reach shareholders soon. Each campus pays first the holders of $6.09bn of secured notes issued by the subsidiaries that own the buildings. Next comes Macquarie Asset Management, which holds $1.8bn of preferred units paying 12.75% in APLD HPC TopCo 2, the holding company above those subsidiaries; TopCo 2 may pay that dividend in extra units rather than cash until Oct. 6, 2035. Applied Digital's own lenders and its shareholders come last. At Aug. 31, $2,909m of the group's $2,950m of unrestricted cash sat inside TopCo 2, the quarterly report filed on Oct. 7 shows, leaving about $41m* outside it.

The shares closed at $18.05 on Oct. 16, valuing the equity at about $5.5bn*. Add debt and Macquarie's units and net off unrestricted cash, and enterprise value is about $11.3bn*. Two things stand between the leases and that equity: a power contract at the flagship campus that is smaller than the load leased there, and $4.26bn of debt that falls due in the fiscal year to May 2031.

A power contract smaller than the leases

Noteholders take $687m of Applied Digital's rent in fiscal 2028 before Macquarie, the parent and shareholders

Filed minimum rent through the order of payment, $ million, and the debt cover that results, times. Macquarie's dividend accrues in extra units and is not deducted.

In fiscal 2028, $1.58bn of filed rent leaves about $1.41bn* after costs; noteholders take $687m, Macquarie's dividend accrues in units, and about $624m* is left for shareholders.
StepSep 2026–May 2027Fiscal 2028
Cash, $ million
Filed minimum rent468.01,579.5
Less campus operating costs*(49.6)(167.3)
Less interest and principal on the three note issues(416.7)(686.9)
Left after noteholders*1.7725.3
Macquarie's 12.75% dividend, accruing in units*185.9, not paid in cash247.9, not paid in cash
Less business-unit and head-office overhead*(53.5)(71.3)
Less parent debt service and Series E-1 dividends*(22.7)(30.3)
Left for shareholders*(74.6)623.7
Debt cover*, times
Campus, three note issues1.00x2.06x
Parent, Macquarie paid in units0.83x1.87x
Parent, Macquarie paid in cash at 12.75%0.58x1.39x
Parent, Ellendale power capped at 350 MW0.83x1.76x
Source: Company filings (10-Q for the quarter to Aug 31, 2026, pp.19, 32, 46, 51, 53; 10-K p.117); Rackline estimates.* Rackline estimates. Operating costs at the filed 89% rental margin (89.4% unrounded); principal and interest as filed. No lender tests these ratios. Cash at Aug 31, 2026: $2,909m inside TopCo 2, about $41m* outside.

At Polaris Forge 1, its Ellendale campus, Applied Digital has leased 400 megawatts of computing load to CoreWeave, which rents out AI computing, on 15-year leases. The state's air permits label the three buildings ELN-02, ELN-03 and ELN-04. ELN-02, 100 megawatts, opened in October 2025, about a year after Montana-Dakota Utilities' 2023 filing expected it to be energized. ELN-03, 150 megawatts, opened in halves on July 1 and Oct. 1, taking live capacity to 250 megawatts, the company said on Oct. 7. ELN-04, another 150 megawatts, is due in 2027.

Montana-Dakota supplies the AI buildings under one electric service agreement, which the North Dakota Public Service Commission approved in case PU-23-322 and amended in case PU-24-332. The amendment raised the limit from 225 megawatts to 350 megawatts and ran the contract to Aug. 31, 2030. No filing on the commission's docket raises it further, and ELN-04 has no power contract of its own on file. With 250 megawatts live, the cap does not bind yet. It bites at full build, once ELN-04 arrives: 400 megawatts of leased load is more than 350 even before cooling and other overhead. A separate 180-megawatt contract, case PU-22-371, serves the older cryptocurrency-hosting building next door.

The contract runs five years, the tariff's maximum, extendable by five with the commission's approval, under section 18 of the agreement in case PU-23-322. It sits under Montana-Dakota's Rate 45, a tariff for large computing loads the utility may interrupt. At Polaris Forge 3, in Center, the utility's filing in case PU-26-235 cites the same five-year limit as it asks the commission to allow 15 years. Ellendale has no such request pending.

Applied Digital has also asked the commission, in case PU-26-155, to let it register its Ellendale backup diesel engines as emergency supply for the regional grid operator, the Midcontinent Independent System Operator. Its filing says the 252 engines can generate up to 756 megawatts; only ELN-02's 60 engines had been installed and tested when it filed the request in April. The commission has not ruled.

Ellendale has 400 MW leased against 350 MW of contracted grid power, and that contract ends in Aug 2030

Contracted utility power against leased IT capacity by North Dakota campus, megawatts, at Oct 17, 2026.

At Ellendale, CoreWeave has leased 400 MW against a 350 MW utility contract that ends Aug 31, 2030. Harwood's contract is not public; Center's 430 MW contract awaits approval.
CampusContracted power, MWPower contract endsLeased IT, MWLive IT, MWPower shortfall at full lease*
Ellendale (Polaris Forge 1)350Aug 31, 2030400 (CoreWeave)25050
Harwood (Polaris Forge 2)n/a: contract not public; peak load of 280 stated by Minnkotan/a200 (Oracle)None yetn/a
Center (Polaris Forge 3)Up to 430, pending approval15 years from service start (pending)300 (tenant not named)None yetNone if approved; up to 430 MW pending (PU-26-235)
Source: company filings (10-K; 10-Q; Oct 7, 2026 results release); North Dakota Public Service Commission dockets; Rackline estimates.* Rackline estimate: leased IT less contracted power. Leased MW is IT load; a site draws more at the meter. Ellendale's 350 MW excludes the 180 MW hosting site. Roughrider Electric protests Center. Dockets: PU-23-322, PU-24-332 (Ellendale); PU-26-235 (Center); PU-26-22 (Harwood).

Polaris Forge 2, in Harwood, is leased to Oracle. The annual report names only an investment-grade hyperscaler, but the indenture for the 6.750% notes that finance the campus names Oracle under two service orders dated Oct. 20, 2025: 150 megawatts in one building and 50 in a second. The lease is 200 megawatts, the annual report and the indenture show, and the indenture keeps anything above that out of the noteholders' collateral. The quarterly report says the two buildings have 300 megawatts of aggregate capacity, without defining the term, and no filing shows a tenant for the difference. Minnkota Power Cooperative, which will supply the site through Cass County Electric Cooperative, says peak load will be 280 megawatts; no filing with the commission gives a figure. Minnkota's September construction report in case PU-26-22 shows that testing at its new substation south of Harwood had barely begun: 10% commissioned, against a December target, with structures 95% set.

At Center, Montana-Dakota's contract allows up to 430 megawatts for 300 megawatts of leased load, but it awaits approval. Roughrider Electric Cooperative has protested, saying the site lies in its territory, and no hearing is set. The $110m of grid upgrades is charged to Applied Digital, and part arrives only in 2029, Montana-Dakota testified. Separately, on Oct. 4 Applied Digital agreed to buy power for 15 years from a planned 1,200-megawatt gas plant at Center being developed by Base Electron, in which Applied Digital and some of its officers and directors hold stakes. The quarterly report calls the plant dedicated generation for Polaris Forge 3; the annual report calls it front-of-the-meter supply. No filing explains how it fits beside the utility contract.

Polaris Forge 3 and two southern campuses, Delta Forge 1 in Louisiana and Delta Forge 2, are leased to a tenant the company describes only as a high investment-grade hyperscaler: 810 megawatts, worth about $20.2bn, starting in 2027 and 2028. The leases are take-or-pay. A tenant leaving for convenience owes the remaining value, though it may terminate over long construction delays.

Who gets paid first

If every building opens on time, Applied Digital's rent-paying megawatts nearly quadruple by fiscal 2029

Megawatts paying rent, averaged over each fiscal year to May 31: filed minimum rent divided by full-run rent per megawatt, against the 1,410 MW under lease.

Rent-paying megawatts*

Megawatts

0 MW500 MW1,000 MW1,500 MWUnder lease: 1,410 MWFY2027 (Sep–May): Rent-paying megawatts*, 371 MWFY2028: Rent-paying megawatts*, 939 MWFY2029: Rent-paying megawatts*, 1,404 MWFY2030: Rent-paying megawatts*, 1,410 MWFY2027 (Sep–May)FY2027 (Sep–May)FY2028FY2028FY2029FY2029FY2030FY2030Fiscal year to May 31
View chart data
If every building opens on time, Applied Digital's rent-paying megawatts nearly quadruple by fiscal 2029
Fiscal year to May 31Rent-paying megawatts*
FY2027 (Sep–May)371 MW
FY2028939 MW
FY20291,404 MW
FY20301,410 MW
Source: Company filings (10-K for the year to May 31, 2026, pp.6-7; 10-Q to Aug 31, 2026, pp.32, 42; 6.750% note indenture); Rackline estimates.* Rackline estimate: filed minimum rent ÷ $1.68m per MW-year at full run. Leased: CoreWeave 400 MW; Oracle 200 MW (Harwood has 300 MW of capacity, undefined); an unnamed cloud company 810 MW. Ellendale's 350 MW power cap binds from ELN-04 in 2027.

Each campus has its own lender. The 9.250% notes due December 2030, $2.35bn, were issued by APLD ComputeCo and are secured on ELN-02, ELN-03 and the CoreWeave leases behind them. The 6.750% notes due March 2031, $2.15bn, were issued by APLD ComputeCo 2 and are secured on Harwood and Oracle. The 7.000% notes due June 2031, $1.59bn, were issued in June by APLD ComputeCo 3 to build ELN-04. The annual report says TopCo 2 wholly owns ComputeCo and ComputeCo 2; ComputeCo 3 has the same direct parent as ComputeCo, so the 7.000% notes sit there too*. On recourse the filings say two things. Applied Digital's debt note says the parent guarantees only completion of the campuses, a promise to finish the buildings, and gives no other credit support. Its note on the companies it controls says TopCo 2 is bankruptcy-remote, with separate assets and liabilities, but that TopCo 2's creditors have recourse to the parent's assets and general credit. The filings do not reconcile the two. The parent last stood fully behind campus debt with a $300m bridge loan for ELN-04, which carried a full parent guarantee until the 7.000% notes repaid it on June 16, 2026.

The noteholders' real protection is the tenant. A missed rent payment is not itself a default on the notes. If a lease ends and is not replaced within six months by a qualifying tenant, the notes default under section 6.01(11) of each indenture; a signed letter of intent and a full debt-service reserve stretch that to 12 months. The 6.750% indenture lists Oracle, Microsoft, Amazon, Alphabet, Meta and Nvidia as qualifying tenants, plus any listed technology company worth at least $100bn. The two CoreWeave-backed indentures add CoreWeave itself and lower the bar to $50bn.

Macquarie comes next. Its dividend is due after the notes are served and before anything reaches Applied Digital. TopCo 2 paid $60.1m of it in units last quarter, the quarterly report shows, so the parent figures below assume units. The rate rises 0.875 points on Oct. 7, 2030, and again on Oct. 7, 2031, toward a cap of 16.75%, if the units have not been redeemed by then. On a liquidation Macquarie gets at least 1.8 times the money it put in. Applied Digital can buy the units back from April 2028. If they are still outstanding on Oct. 6, 2032, or after trigger events that the annual report does not list, Macquarie can require TopCo 2 to put itself up for sale.

Below both sits the parent. A $430m revolving credit facility led by Goldman Sachs, with $82.4m drawn and $241.0m used for letters of credit, is secured on assets outside the campuses. A $58.5m Texas Capital Bank loan requires a market value above $2.0bn, about $6.61* a share. The parent also owes $450m of convertible notes due June 2030. Total debt principal is $6.72bn, convertibles included, though the quarterly report's table labels it term loans.

Rackline measures coverage as cash against what is owed: filed minimum rent times the 89% rental margin Applied Digital reports as its own measure, divided by filed principal and interest. No lender tests these ratios. None of the three indentures has a coverage test, and the revolving facility's test leaves TopCo 2 out. On the three note issues, campus cover is 1.00 times* in the nine months to May 2027 and 2.06 times* in fiscal 2028. At the parent, after overhead and all debt, it is 0.83 times* and 1.87 times*, with Macquarie paid in units. Paid in cash at 12.75%, it would be 0.58 times* and 1.39 times*. Paying in kind keeps cash in the business but enlarges a claim that comes ahead of shareholders, and the step-ups raise the rate at which it compounds. The Ellendale cap does not bite until ELN-04 arrives in 2027: parent cover stays 0.83 times* this year and falls to 1.76 times* in fiscal 2028.

Applied Digital's debt cover is at its thinnest now; most of its peers face that squeeze in 2027–29

Debt cover in each company's thinnest period: cash flow divided by principal and interest due, times. Each row uses its own cash-flow measure and fiscal period.

Applied Digital's debt cover is about 1.0* now, its thinnest period, and CoreWeave's about 0.8*. IREN, TeraWulf, Cipher, Core Scientific and Galaxy's projects reach their thinnest in 2027–29.
CompanyThinnest periodDebt cover*, timesCash flow counted
Applied DigitalSep 2026–May 20271.0Filed minimum rent at the company's 89% rental margin; all debt
CoreWeave (tenant)Jul–Dec 20260.8Adjusted operating earnings, company definition
IRENJul 2027–Jun 20280.8Adjusted operating earnings on filed contracts, assumed 59% margin
TeraWulf20271.4Lease profit at its 85% target margin
Galaxy Helios II20270.4Company's project cash flow; gross interest
Cipher Digital20281.3Company-projected rental profit
Galaxy Helios I20280.2Project rental profit; includes $1.27bn loan maturity
Core Scientific20290.6Colocation profit before depreciation
Source: company filings and investor presentations; Rackline estimates.* Rackline estimates; below 1.0, cash flow falls short of debt due. Each company uses its own cash-flow measure and fiscal year, so rows are not like for like. Applied Digital is before overhead. No lender tests these ratios. New borrowing is left out.

The bigger test is the maturity wall. Of the $6.72bn, $4.26bn, about 63%*, falls due in fiscal 2031, from June 2030 to May 2031, when the convertibles, the 9.250% notes and the 6.750% notes mature. Filed minimum rent that year is $2.37bn. The annual report is blunt about the plan: "It is likely that we will need to refinance at least a portion of our outstanding debt."

The CoreWeave link

Satellite view of three large white data-center roofs north of rows of older hosting buildings and two substations on farmland west of Ellendale, North Dakota
The same site from space on Oct. 16, 2026. The new Polaris Forge 1 buildings, the large white roofs, stand north of the area in the 2023 photo, which is outlined in yellow. Contains modified Copernicus Sentinel data 2026.

Nearly two-thirds of Applied Digital's debt falls due in one year, fiscal 2031

Scheduled debt principal by fiscal year, $ million, at Aug 31, 2026. Applied Digital's fiscal year ends May 31, so fiscal 2031 runs from June 2030 to May 2031.

Debt principal, including convertible notes

$ million

$0.0$2,000.0$4,000.0$6,000.0FY2027 (Sep–May): Debt principal, including convertible notes, $108.7FY2028: Debt principal, including convertible notes, $221.5FY2029: Debt principal, including convertible notes, $341.5FY2030: Debt principal, including convertible notes, $354.3FY2031: Debt principal, including convertible notes, $4,256.7Later: Debt principal, including convertible notes, $1,438.9FY2027 (Sep–May)FY2027 (Sep–May)FY2028FY2028FY2029FY2029FY2030FY2030FY2031FY2031LaterLaterFiscal year to May 31
  1. FY2031 — 63.3%* of the total: convertible notes (June 2030), 9.250% notes (Dec 2030) and 6.750% notes (Mar 2031)

  2. Later — 7.000% notes (June 15, 2031) and the $58.5m Texas Capital loan (June 30, 2031), both in fiscal 2032

View chart data
Nearly two-thirds of Applied Digital's debt falls due in one year, fiscal 2031
Fiscal year to May 31Debt principal, including convertible notes
FY2027 (Sep–May)$108.7
FY2028$221.5
FY2029$341.5
FY2030$354.3
FY2031$4,256.7
Later$1,438.9
Source: company filings (10-Q for the quarter to Aug 31, 2026, p.19; note indentures); Rackline estimates.* Rackline estimate. The 10-Q's heading calls this schedule term loans; it sums all debt principal. That includes the $450m of convertible notes due June 2030. Macquarie's $1.8bn of preferred units are excluded. The 9.250% notes amortize from Dec 2027. Total: $6,721.6m.

Last quarter Applied Digital booked $79.1m of data-center rental and other revenue, $65.8m of it base rent; its quarterly report credits the AI business's profit to the first two Ellendale buildings, which are leased to CoreWeave, and to fit-out work. By contract value CoreWeave is about 30%* of the $36.2bn.

The credit behind CoreWeave's rent has shifted. On March 30 CoreWeave moved two of the four halls in ELN-02, and all of ELN-03, to a subsidiary, CoreWeave Compute Acquisition Co. VIII, an amended current report Applied Digital filed on April 1 shows. The same day that subsidiary took on CoreWeave's $8.5bn delayed-draw loan, which CoreWeave's quarterly report describes as secured on the subsidiary's assets. CoreWeave backs the moved leases with springing guaranties that take effect if the subsidiary or CoreWeave goes bankrupt, if the rating on the subsidiary's financing falls to a redacted level, or if the subsidiary's own computing contract ends or defaults. CoreWeave also owed a $50m letter of credit; no filing confirms delivery. In June Applied Digital agreed in principle to move the ELN-04 lease the same way if the subsidiary wins an investment-grade rating.

A CoreWeave stumble would arrive in stages. Missed rent calls on the guaranty and the letter of credit. A bankruptcy triggers the guaranty. A rejected or terminated lease starts the six-to-12-month re-letting clock. Applied Digital, for its part, guarantees its landlord subsidiaries' obligations to CoreWeave. Power is not a default under any of the three indentures. CoreWeave's leases, filed in June and September 2025, set each hall's rent by the power available to it. If the utility fails, the landlord runs its generators, and the filed text does not cut or end rent for that alone. CoreWeave can terminate if a fire or other casualty takes power below 90% of a hall's level and repairs run past 180 days, or after an uncured landlord default, which includes the landlord causing a loss of power. The schedule setting out remedies for outages was not filed.

The cloud unit and the price

The cloud business is out of the core but not gone. On May 5 Applied Digital put it into Ekso Bionics, a listed exoskeleton maker that became ChronoScale, and it still owns about 96%. No filing describes a sale of that stake. At ChronoScale's Oct. 16 close the stake is worth about $2.1bn*, though only about 4% of its shares are held outside Applied Digital*.

Applied Digital's enterprise value is about 0.32 times* its $35.7bn of filed minimum lease payments, or 0.26 times* with the ChronoScale stake at market. TeraWulf trades at about 0.35 times* the contracts it has announced, Cipher Digital at 0.54 times* the backlog it has stated, IREN at 0.95 times* its cloud contracts and Core Scientific at 1.14 times* its filed lease receipts. Applied Digital's multiple leaves out the unfiled cost of finishing three campuses.

Verdict

The notes are sound while the tenants pay: at the campus level, rent covers note payments about twice* in fiscal 2028, against 1.87 times* at the parent. The equity is a bet on everything below that line: that Applied Digital refinances $4.26bn in fiscal 2031, renews the Ellendale power contract, finances three more campuses and still has cash left after Macquarie. With about $41m* outside TopCo 2 today, the parent depends on new money until the rent reaches it. Wes Cummins, the chief executive, pitches scarcity: "Put simply, we view every new restriction elsewhere as making what we already own harder to replicate," he said in the company's results release on Oct. 7.

Watch one window. Ellendale's power contract ends on Aug. 31, 2030; Macquarie's rate steps up on Oct. 7, 2030, and again on Oct. 7, 2031; and $4.26bn falls due in fiscal 2031, which runs from June 2030 to May 2031. The power date is a renewal signpost, not a credit event: a lapsed utility contract does not cut rent, and only a lease ending starts the six-month re-letting clock. Before then, watch the commission's rulings on the diesel request and at Center, Harwood's first power, CoreWeave's $50m letter of credit and the first refinancing.

What is filed, what is stated, what we couldn't find

What the filings show, what the company has only stated, and what we could not find

Each claim in this article by source status. Filed means a regulatory filing; stated means a company or utility statement.

Most claims are filed with the SEC or North Dakota regulators. The 7.000% notes' place under TopCo 2 is a Rackline deduction; Harwood's peak load is stated; seven items could not be found.
ItemStatusWhere
Leases, megawatts and lease valuesFiled10-K pp.6-7; 10-Q p.32
Note issues, completion guarantees, six-month re-letting defaultFiledIndentures s.6.01; 10-K pp.48-49
Oracle as Harwood tenant (service orders, Oct 20, 2025)Filed6.750% indenture s.1.01
9.250% and 6.750% notes under TopCo 2Filed10-K pp.43-44
7.000% notes under TopCo 2, via APLD HPC Holdings 2 LLCRackline deduction* from filed sentences10-K pp.43, 50, 97, 100
Cash inside TopCo 2 ($2,909m); about $41m* outsideFiled; our estimate*10-Q pp.1, 26
Macquarie dividend, in kind to Oct 6, 2035, step-ups, 1.8 times minimum return, buyback from Apr 2028Filed10-K p.117
$60.1m Macquarie dividend paid in kind last quarterFiled10-Q pp.6, 32
Parent gives completion guarantees onlyFiled10-K pp.48-49; 10-Q p.21
TopCo 2 creditors have recourse to the parent's assets and general creditFiled; not reconciled with the debt note10-K p.104; 10-Q pp.25-26
$300m ELN-04 bridge loan had a full parent guarantee; repaid by 7.000% notes, June 16, 2026Filed10-K pp.50-51, 100
Coverage test in indenturesNoneIndentures; revolver test excludes TopCo 2
Macquarie sale right from Oct 6, 2032Filed10-K p.118
Events that trigger Macquarie's sale right earlierCouldn't find10-K p.118 names none
Ellendale cap of 350 MW to Aug 31, 2030FiledPU-23-322; PU-24-332
Ellendale contract: five years, the tariff's maximum, extendable by five with commission approvalFiledPU-23-322, section 18; Rate 45
Diesel engines as grid emergency supply; up to 756 MW by the company's countFiled, not ruledPU-26-155 (scanned)
CoreWeave rent set per hall by power; termination below 90% for 180+ days or landlord defaultFiledLeases, 8-Ks of Jun 2 and Sep 3, 2025
Center contract (430 MW, 15-year waiver sought); Roughrider protestFiled, pendingPU-26-235; PU-26-236
Harwood substation: structures 95% set, testing 10% commissioned, December targetFiledPU-26-22, Minnkota September report, filed Oct 1
Harwood peak load of 280 MWStatedMinnkota; company release
Harwood 300 MW of aggregate capacity, undefinedFiled10-Q p.42
Harwood 200 MW leased (150 + 50)Filed10-K p.7; 6.750% indenture
Coverage, 350 MW case, market and enterprise value, peer multiplesOur estimates*See method
Schedule F, the leases' outage remediesCouldn't findNot filed with lease exhibits
Filing that lifts Ellendale's cap or powers ELN-04Couldn't findCommission docket search
Tenant for Harwood's extra 100 MWCouldn't find—
Harwood power contract termsCouldn't findNot public
Tenant of Polaris Forge 3 and Delta ForgeCouldn't find10-K describes, does not name
Delivery of CoreWeave's $50m letter of creditCouldn't find—
Total cost to finish Polaris Forge 3 and Delta ForgeCouldn't find—
Sale of the ChronoScale stakeCouldn't find—
Source: Company filings; note indentures; North Dakota Public Service Commission dockets; Rackline analysis.* Rackline estimate or deduction. 10-K: annual report for the year to May 31, 2026. 10-Q: quarterly report to Aug 31, 2026. PU numbers are North Dakota Public Service Commission cases.

* Figures marked with an asterisk are Rackline estimates.

Method

Cash outside TopCo 2* is consolidated unrestricted cash of $2,949.9m less TopCo 2's $2,909.4m (10-Q, Aug. 31, 2026). Market value* uses the Oct. 16, 2026 Nasdaq close of $18.05 and 302.4m shares on the 10-Q cover. Enterprise value* adds $6,721.6m of debt principal, Macquarie's units ($2,010.9m) and Series E-1 preferred ($56.4m), less unrestricted cash. Total debt principal of $6,721.6m (10-Q p.19) is every borrowing, including the $450m of convertibles, although the table is labeled term loans.

Placement of the 7.000% notes*: APLD HPC Holdings 2 LLC is the direct parent of both ComputeCo and ComputeCo 3, and the 10-K says TopCo 2 wholly owns ComputeCo, so Holdings 2 and ComputeCo 3 sit inside TopCo 2 (10-K pp.43, 50, 97, 100). No single filing says so outright. TopCo 2's long-term debt of $5,918.6m (10-Q p.26) is consistent with all three note issues less issuance costs*. APLD Holdings 2 LLC, without HPC, is a different company that sits above TopCo 2.

Coverage* uses filed minimum lease payments (10-Q p.32) times the 89% rental margin (89.4%* unrounded: $58.8m on $65.8m of base rent), net operating income over base rent, which Applied Digital files as its own non-standard measure (10-Q p.46; reconciliation pp.50-51). The denominator is filed principal and interest (10-Q pp.19, 53). Campus level covers the three note issues only. Parent level subtracts business-unit and recurring head-office cash overhead and covers all debt and Series E-1 dividends, with Macquarie paid in kind; the cash case at 12.75% is a sensitivity. Fiscal 2027 covers the nine months to May 2027. With rent down a fifth and costs fixed, campus cover across all debt is 0.75 times* and 1.54 times*. Coverage is Rackline's measure; no indenture has a coverage test, and the revolving facility's test excludes TopCo 2.

The 350-megawatt case* scales estimated Ellendale rent ($11.0bn over 15 years for 400 megawatts) by 350/400 from ELN-04's delivery, modeled from fiscal 2028; with 250 megawatts live, the cap does not bind in fiscal 2027.

Peer multiples* divide each company's enterprise value at Oct. 16 closes by contracted revenue from its latest filing, release or presentation; TeraWulf excludes Core42, Core Scientific excludes leases not yet started, and IREN uses cloud contracts rather than leases. Galaxy is not computed: its data centers are a small part of a trading and lending group.

Earlier basis: Rackline's Oct. 16 credit piece used megawatts on line times one lease price at a 72.9% margin, which gave campus cover of 0.84 times* and 1.56 times*, or 0.71 times* and 1.31 times* after segment overhead. That basis is superseded. On today's basis, cover for the rest of fiscal 2027 across all debt is 0.90 times* after segment overhead and 0.84 times* after segment and head-office overhead; that 0.84 times* is a new figure, not the old headline.

Source · sec.gov